| Project Name | Location | Operator/Utility | GFM Tech Size (MW) | OEM | Technology | Year | Operational? | Incentives Text (EDIT THIS) | Incentives URL (EDIT THIS) | More information Text (EDIT THIS) | More information URL (EDIT THIS) | Incentives | More information |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bungama BESS | Australia | AEMO | 200 | GFM BESS | 2025 | N | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://risenenergy.com.au/risen-energy-australia-granted-arena-funding-for-bungama-bess-project/ | Arena Large Scale Battery Storage Funding Round | More info | |
| Bungama BESS | Australia | AEMO | 200 | Wärtsilä | GFM BESS | 2026 | N | ||||||
| Calala BESS | Australia | AEMO | 300 | Tesla | GFM BESS | 2027 | N | https://www.equis.com.au/… | https://www.equis.com.au/news/equis-reaches-financial-close-and-commences-construction-of-calala-battery-energy-storage-system-further-progressing-one-of-australias-largest-utility–scale-battery-portfolios | Delayed commissioning until 2027 | https://www.equis.com.au/… | Delayed commissioning until 2027 | |
| Eccles | Great Britain | NESO | 400 | SMA | GFM BESS | 2026 | N | NESO Stability Pathfinder, Phase 2 | https://www.neso.energy/industry-information/balancing-services/network-services-procurement/stability-network-services-procurement | More info | https://www.zenobe.com/battery-project-development/eccles-scottish-borders-400mw-battery-energy-storage-system/ | NESO Stability Pathfinder, Phase 2 | More info |
| Elaine BESS | Australia | AEMO | 311 | Tesla | GFM BESS | 2027 | N | https://infrastructurepipeline.org/… | https://infrastructurepipeline.org/project/elaine-bess | https://infrastructurepipeline.org/… | |||
| Hams Hall | Great Britain | NESO | 350 | Sungrow | GFM BESS | 2026 | N | https://luminous.energy/hamshall/ | https://luminous.energy/hamshall/ | More info | https://luminous.energy/hamshall/ | https://luminous.energy/hamshall/ | More info |
| Huadian Qiongjie County Grid-Forming ESS | Tibet | 12 | Sungrow | GFM BESS | N | ||||||||
| Huaneng Chabala Grid-Forming ESS | Tibet | 10 | Sungrow | GFM BESS | N | ||||||||
| Huaneng Saini Ganden Khamsang Grid-Forming ESS | Tibet | 24 | Sungrow | GFM BESS | N | ||||||||
| Jingneng Guilin Grid-forming ESS | China; Guangxi | 184 | Sungrow | GFM BESS | N | ||||||||
| Kilmarnock South | Great Britain | NESO | 300 | SMA | GFM BESS | 2026 | N | NESO Stability Pathfinder, Phase 2 | https://www.neso.energy/industry-information/balancing-services/network-services-procurement/stability-network-services-procurement | More info | https://www.zenobe.com/kilmarnock-south/ | NESO Stability Pathfinder, Phase 2 | More info |
| Liddell Battery | Australia | AEMO | 500 | Power Electronics | GFM BESS | 2025 | N | Slated for completion in May 2026 | More info | https://www.agl.com.au/about-agl/operations/liddell-battery | Slated for completion in May 2026 | More info | |
| Mortlake BESS | Australia | AEMO | 300 | SMA | GFM BESS | 2026 | N | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://www.originenergy.com.au/about/who-we-are/what-we-do/generation/mortlake-battery-project/ | Arena Large Scale Battery Storage Funding Round | More info |
| Mountain View Solar | USA; Hawaii | HECO | 7 | GFM BESS | 2024 | N | https://www.aes-hawaii.com/… | https://www.aes-hawaii.com/mountain-view-solar-storage-project | More info | https://www.aes-hawaii.com/mountain-view-solar-storage-project | https://www.aes-hawaii.com/… | More info | |
| Orana BESS | Australia | AEMO | 415 | Tesla | GFM BESS | 2026 | N | https://www.ecogeneration.com.au/… | https://www.ecogeneration.com.au/orana-bess-hits-halfway/ | https://www.ecogeneration.com.au/… | |||
| Sizing John, Rainhill | Great Britain | NESO | 57 | SMA | GFM BESS | 2025 | N | Slated for energisation December 2026 | More info | https://www.varco.energy/sizing-john-phase-2/ | Slated for energisation December 2026 | More info | |
| TagEnergy BESS | Australia | AEMO | 300 | Tesla | GFM BESS | 2026 | N | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://www.pv-magazine-australia.com/2024/08/06/tagenergy-lands-council-approval-for-600-mwh-queensland-battery/ | Arena Large Scale Battery Storage Funding Round | More info |
| Terang BESS | Australia | AEMO | 100 | Tesla | GFM BESS | 2026 | N | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://frv.com/en/frv-australia-reaches-financial-close-for-the-100mw-200mwh-terang-large-scale-battery-project/ | Arena Large Scale Battery Storage Funding Round | More info |
| Uskmouth Sustainable Energy Park | Great Britain | NESO | 230 | SMA | GFM BESS | 2025 | N | “The 240MWh AW1 Battery Storage project is being developed to be online in 2027 with potential for further expansion to 480MWh later in the decade.” | More info | https://ampeak.energy/uskmouth-sustainable-energy-park/ | “The 240MWh AW1 Battery Storage project is being developed to be online in 2027 with potential for further expansion to 480MWh later in the decade.” | More info | |
| Victorian Big Battery | Australia | AEMO | 300 | Tesla | GFM BESS | 2024 | N | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://arena.gov.au/projects/neoen-victorian-big-battery-moorabool/ | Arena Large Scale Battery Storage Funding Round | More info |
| Waena BESS | USA; Hawaii | HECO | 40 | Tesla | GFM BESS | 2027 | N | https://www.hawaiianelectric.com/… | https://www.hawaiianelectric.com/hawaiian-electric-to-begin-construction-of-first-standalone-load-shifting-battery-energy-storage-system-on-maui | https://www.hawaiianelectric.com/… | |||
| Waiawa Phase 2 Solar | USA; Hawaii | HECO | 30 | GFM BESS | N | ||||||||
| Waiawa Phase 2 Solar + Storage | USA; Hawaii | HECO | 60 | Hitachi Energy | GFM BESS | 2026 | N | More info | https://cleanview.co/planned-solar-projects/hawaii/66066_WAIPV/aes-waiawa-phase-2-solar | More info | |||
| Western Downs Stage 3 | Australia | AEMO | 285 | Tesla | GFM BESS | 2027 | N | https://neoen.com/… | https://neoen.com/en/news/2025/neoen-delivers-western-downs-battery-stage-2-and-launches-stage-3-in-queensland-australia/ | https://neoen.com/… | |||
| Alpiq GFM BESS | Finland | Fingrid | 30 | Merus Power | GFM BESS | 2025 | Y | https://meruspower.com/… | https://meruspower.com/news/important-launch-from-merus-power-the-first-grid-forming-battery-energy-storage-system-in-the-nordics/ | https://meruspower.com/… | |||
| Amaala Project | Saudi Arabia | 160 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Blackhillock, Phase I | Great Britain | NESO | 200 | SMA | GFM BESS | 2024 | Y | NESO Stability Pathfinder, Phase 2 | https://www.neso.energy/industry-information/balancing-services/network-services-procurement/stability-network-services-procurement | More info | https://www.zenobe.com/news-and-events/zenobe-breaks-ground-on-pioneering-300mw-battery-in-blackhillock/ | NESO Stability Pathfinder, Phase 2 | More info |
| Blackhillock, Phase II | Great Britain | NESO | 100 | SMA | GFM BESS | 2025 | Y | https://www.zenobe.com/… | https://www.zenobe.com/news-and-events/blackhillock-battery-storage-launch/ | https://www.zenobe.com/… | |||
| Blyth Battery | Australia | AEMO | 238 | Power Electronics | GFM BESS | 2025 | Y | https://blythbattery.com.au/ | https://blythbattery.com.au/ | More info | https://neoen.com/en/news/2023/neoen-launches-construction-of-200-mw-400-mwh-blyth-battery-in-south-australia/ | https://blythbattery.com.au/ | More info |
| Bordesholm | Germany | Versorgungsbetriebe Bordesholm | 15 | SMA | GFM BESS | 2019 | Y | More info | https://www.sma.de/en/large-scale/stand-alone-grid-bordesholm-region | More info | |||
| Brendale BESS | Australia | AEMO | 205 | Tesla | GFM BESS | 2025 | Y | ||||||
| Broken Hill BESS | Australia | AEMO | 50 | Fluence / EPC Power | GFM BESS | 2023 | Y | ||||||
| China First Grid-Forming ESS+PV Project | China; Yanweijuyan, Gansu | 10 | Sungrow | GFM BESS | 2024 | Y | |||||||
| China First Pure PV Grid-Forming Project | China; Baolin, Hubei | 50 | Sungrow | GFM PV | 2023 | Y | |||||||
| China Resources Electric Power Hami | China; Hami | 25 | Huawei | GFM BESS | 2024 | Y | |||||||
| Cleve Hill Solar Park | Great Britain | NESO | 150 | SMA | GFM BESS | 2025 | Y | Solar is fully functional, energy storage will be operational by early 2026. | More info | https://www.clevehillsolar.com/ | Solar is fully functional, energy storage will be operational by early 2026. | More info | |
| Dalia Black Start Project | Israel | 16 | Sungrow | GFM BESS | 2022 | Y | |||||||
| Dalrymple | Australia | AEMO | 30 | Hitachi Energy | GFM BESS | 2018 | Y | ||||||
| Ejina Wide-Area Renewable Power System Project | China; Inner Mongolia | 25 | NR Electric | PV+Wind+GFM BESS | 2023 | Y | |||||||
| Eurimbula Solar Farm and BESS | Australia; Queensland | AEMO | 666 | SMA | GFM BESS | 2025 | Y | ||||||
| Golmud Leuneng | China; Qinghai | 25 | Huawei | GFM BESS | 2024 | Y | |||||||
| Greenbank BESS | Australia | AEMO | 200 | Tesla | GFM BESS | 2025 | Y | ||||||
| Grid-Forming ESS Black Start Gas Turbine Project | USA; Indiana | 15 | Sungrow | GFM BESS | 2019 | Y | |||||||
| Grid-Forming ESS Project | China; Luopu, Xinjiang | 250 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Grid-Forming ESS Project | Tibet; Ihsasa | 40 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Guoneng Ningdong Shuguang Project | China; Ningxia | SGCC | 65 | NR Electric | GFM BESS | 2024 | Y | ||||||
| Heilongjiang Duobaoshan Static Self-synchronous Compensator Project | China; Heilongjiang | SGCC | 90 | NR Electric | GFM SSC | 2025 | Y | ||||||
| Heilongjiang Kedong Static Self-synchronous Compensator Project | China; Heilongjiang | SGCC | 50 | NR Electric | GFM SSC | 2025 | Y | ||||||
| Hornsdale Power Reserve | Australia | AEMO | 150 | Tesla | GFM BESS | 2022 | Y | ||||||
| Huadian Jinchuan Hongyuan Grid-forming ESS | China; Sichuan | 50 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Huadian Rikaze Sanzuzi Qumei PV+ESS | Tibet | 18 | Sungrow | PV+GFM BESS | 2024 | Y | |||||||
| Huadian Shannan Naidong Cai Peng Phase II | Tibet | 20 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Hubei Jingmen Gaoqiao GFM BESS | China; Wuhan | SGCC | 50 | NR Electric | GFM BESS | 2022 | Y | ||||||
| Jilin Bamian Static Self-synchronous Compensator Project | China; Jilin | SGCC | 50 | NR Electric | GFM SSC | 2024 | Y | ||||||
| Jilin Xiangrong Static Self-synchronous Compensator Project | China; Jilin | SGCC | 50 | NR Electric | GFM SSC | 2024 | Y | ||||||
| Kapolei Energy Storage | USA; Hawaii | HECO | 185 | Tesla | GFM BESS | 2023 | Y | ||||||
| Kauai PMRF | USA; Hawaii | KIUC | 14 | GFM BESS | 2022 | Y | |||||||
| Koorangie BESS | Australia | AEMO | 185 | Tesla | GFM BESS | 2025 | Y | ||||||
| KPM Copper Mine New Energy Project | Democratic Republic of Congo | 20 | NR Electric | PV+GFM BESS | 2025 | Y | |||||||
| Kriegers Flak | Denmark/Germany | Energinet/50Hertz Transmission Gmb | 410 | Hitachi Energy | HVDC back-to-back system | 2018 | Y | More info | https://www.hitachienergy.com/us/en/news-and-events/customer-success-stories/kriegers-flak-combined-grid-solutions–kf-cgs–hvdc | More info | |||
| Kupono Solar | USA; Hawaii | HECO | 42 | Tesla | GFM BESS | 2024 | Y | More info | https://www.ameresco.com/kuponosolar/ | More info | |||
| LaguoCuo Lithium Extraction Project | Tibet | SGCC | 193 | NR Electric | PV+GFM BESS | 2024 | Y | ||||||
| Liaoning Zhangbei Wind GFM STATCOM Project | China; Liaoning | SGCC | 50 | NR Electric | GFM STATCOM | 2024 | Y | ||||||
| Limondale BESS | Australia | AEMO | 50 | Tesla | GFM BESS | 2025 | Y | ||||||
| Mackinac | USA; Michigan | ATC | 200 | Hitachi Energy | HVDC back-to-back system | 2014 | Y | More info | https://www.atc-projects.com/projects/mackinac-hvdc-flow-control-project/ | More info | |||
| Maritime Link | Canada; Nova Scotia | NSP Maritime Link Inc. | 500 | Hitachi Energy | HVDC bipolar system | 2018 | Y | Hitachi Energy: Maritime Link | https://www.hitachienergy.com/us/en/news-and-events/customer-success-stories/maritime-link | More info | https://www.emeranl.com/docs/librariesprovider13/maritime-link-documents/01242014ml-overview.pdf?sfvrsn=91526a49_2 | Hitachi Energy: Maritime Link | More info |
| Mehrum’s E-Statcom Project | Germany | TenneT | 300 | Siemens Energy | GFM STATCOM | 2025 | Y | https://www.siemens-energy.com/… | https://www.siemens-energy.com/us/en/home/stories/grid-stability-first-e-statcom.html | https://www.siemens-energy.com/… | |||
| Melbourne Renewable Energy Hub | Australia | AEMO | 600 | Tesla | GFM BESS | 2025 | Y | ||||||
| Neilston Greener Grid Park | Great Britain | NESO | 50 | SMA | GFM BESS | 2025 | Y | ||||||
| New England BESS | Australia | AEMO | 200 | Energy Vault | GFM BESS | 2023 | Y | ||||||
| Ningxia Longyuan Mengjiawan | China; Ningxia | SGCC | 295 | NR Electric | GFM BESS | 2025 | Y | ||||||
| Project #1 | USA; Hawaii | KIUC | 13 | Tesla | GFM BESS | 2018 | Y | ||||||
| Provincetown BESS | USA; Massachusetts | Eversource Energy | 25 | SMA | GFM BESS | 2022 | Y | More info | https://content-cdn.sessionboard.com/content/MJNKtYr3QrerB90XuTep_DTECH2024_Grid forming inverters_final.pdf | More info | |||
| Qinghai Baohu Grid-Forming BESS | China; Qinghai | SGCC | 108 | NR Electric | GFM BESS | 2024 | Y | ||||||
| Riverina and Darlington Point | Australia | AEMO | 150 | Tesla | GFM BESS | 2023 | Y | ||||||
| Saudi Arabia Red Sea New Town Project | Saudi Arabia | 240 | Huawei | GFM BESS | 2023 | Y | |||||||
| Shallow Basket project | USA; New Mexico; Jicarilla Apache Nation | National Renewable Solutions | 50 | Tesla | GFM BESS | 2025 | Y | NRS’s Shallow Basket Energy Project Brings Renewable Energy to Jicarilla Apache Nation | https://natrs.com/nrss-shallow-basket-energy-project-brings-renewable-energy-to-jicarilla-apache-nation-building-on-legacy-of-environmental-stewardship/ | NRS’s Shallow Basket Energy Project Brings Renewable Energy to Jicarilla Apache Nation | |||
| Sichuan Chengdu GFM STATCOM Project | China; Sichuan | SGCC | 300 | NR Electric | GFM STATCOM | 2024 | Y | ||||||
| Smithfield BESS | Australia | AEMO | 65 | Tesla | GFM BESS | 2025 | Y | ||||||
| South Fork Wind | USA; New York | Eversource Energy | 75 | GFM STATCOM | 2024 | Y | |||||||
| Swanbank BESS | Australia | AEMO | 250 | Tesla | GFM BESS | 2026 | Y | ||||||
| Tarong BESS | Australia | AEMO | 316 | Tesla | GFM BESS | 2026 | Y | ||||||
| Tibet Dangxiong Static Self-synchronous Compensator Project | Tibet | SGCC | 50 | NR Electric | GFM SSC | 2024 | Y | ||||||
| Victorian Big Battery | Australia | AEMO | 300 | Tesla | GFM BESS | 2021 | Y | https://neoen.com/… | https://neoen.com/en/innovations/neoen-starts-operating-300-mw-victorian-big-battery-in-australia-one-of-the-worlds-largest-batteries/ | https://neoen.com/… | |||
| Wallgrove | Australia | AEMO | 50 | Tesla | GFM BESS | 2022 | Y | ||||||
| Wenshan Grid-Forming ESS | China; Yunnan | 50 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Western Downs Battery | Australia | AEMO | 510 | Tesla | GFM BESS | 2025 | Y | Arena Large Scale Battery Storage Funding Round | https://arena.gov.au/funding/large-scale-battery-storage-funding-round/ | More info | https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/ | Arena Large Scale Battery Storage Funding Round | More info |
| Wheatridge Renewable Energy Facility | USA; Oregon | Pacific Gas & Electric | 380 | PV+Wind+GFM BESS | Y | Funded by the U.S. DOE Solar Energy Technologies Office | Funded by the U.S. DOE Solar Energy Technologies Office | ||||||
| World’s Largest Multi-Energy Grid-Forming Project | Saudi Arabia | 600 | Sungrow | GFM BESS | 2024 | Y | |||||||
| Xinhua Hydropower GFM Fluoride Flow Energy Storage | China; Xinjiang | SGCC | 250 | NR Electric | GFM BESS | 2025 | Y | ||||||
| Xinjiang Lixin Mulei Static Self-synchronous Compensator Project | China; Xinjiang | SGCC | 50 | NR Electric | GFM SSC | 2025 | Y | ||||||
| Xinjiang Shache GFM BESS | China; Xinjiang | SGCC | 200 | NR Electric | GFM BESS | 2025 | Y | ||||||
| Xinjiang Tuokexun Static Self-synchronous Compensator Project | China; Xinjiant | SGCC | 50 | NR Electric | GFM SSC | 2025 | Y | ||||||
| Yunnan Wenshan Qubei Project | China; Yunnan | CSG | 50 | NR Electric | GFM BESS | 2025 | Y | ||||||
| Zhangbei DC Grid | China; Hebei | SGCC | 45 | NR Electric | HVDC DC Grid System | 2023 | Y | ||||||
| Zhongkai Grid-Forming Project | Tibet; Ali | 60 | Sungrow | GFM BESS | 2024 | Y | |||||||