Skip to main content

ESIG - Accelerating the Integration of Variable Generation into Utility Power Systems

  • Members Area
  • About
    • Energy Systems Integration
    • Leadership Team
    • Board of Directors
    • Advisory Council
    • Newsroom
    • ESIG Excellence Awards
  • Blog
  • Resources
    • ESIG Reports/Briefs
    • Past Webinars
    • Past Workshop Presentations
    • Resource Library
    • Quick Reference Guides
    • IEEE Power & Energy Contributions
  • Membership
    • Current ESIG Members
    • Become a Member
    • Member Benefits
    • Student Memberships
    • Mentoring Program
    • Membership Referral
  • Working / Users Groups
    • Task Forces
    • Large Loads Task Force
    • Distributed Energy Resources (DER) Working Group
    • Operations and Maintenance (O&M) Users Group
    • Reliability Working Group
    • Research & Education Working Group
    • System Operation & Market Design Working Group
    • System Planning Working Group
    • GETs User Group
    • Probabilistic VRE Forecasting and Markets User Group
  • Contact
  • Events
    • Upcoming Events
    • Past Events
    • Sponsorship Opportunities
  • Join
  • Login
Loading Events

« All Events

  • This event has passed.

Validating RES Equipment Models for Faithful Reproduction of Network Behavior.

May 9, 2016 - May 10, 2016

  • DOE SunShot Solar Forecasting Projects »

PROGRAM AGENDA, ABSTRACTS, SPEAKER BIOGRAPHIES AND LIST OF ATTENDEES

Introduction and Overview

PURPOSE OF THE WORKSHOP – Charlie Smith, UVIG

A UNITED FRAMEWORK FOR THE ANALYSIS OF MODEL VALIDATION – Nickie Menemenlis and Maurice Huneault, IREQ

Validation of Models for VG Plants for Integration in Power Systems – Part 1

Session A: Validation Requirements

STANDARDS AND OTHER DRIVERS FOR MODEL VALIDATION – Bob Zavadil, EnerNex

NERC MODEL VALIDATION REQUIREMENTS – Ryan Quint, NERC

IRISH MODEL VALIDATION REQUIREMENTS – Martin Eager – EirGrid

CHINA MODEL VALIDATION REQUIREMENTS – Li Qing, China Electric Power Research Institute

Session B: Experience with Wind Plant Model Validation and Field Measurements, Part 1: Manufacturers

VESTAS CASE STUDY OF WIND PLANT MODEL VALIDATION – Kostya Protsenko, Vestas

ENERCON CASE STUDY OF WIND PLANT MODEL VALIDATION – Amgad El-Deib, ENERCON

GE EXPERIENCE WITH FIELD MEASUREMENTS FOR RENEWABLE PLANT MODEL VALIDATION – Matt Richwine, GE

Session C: Experience with Wind Plant Model Validation and Field Measurements, Part 2: Utilities

HQ WIND POWER PLANT MODEL AND PERFORMANCE VALIDATION EXPERIENCE – Charles-Eric Langlois, Mohamed Asmine, Hydro Quebec

FIELD MEASUREMENT AND MODEL VALIDATION TESTS FROM RIVIERE-DU-MOULIN 350 MW WIND PLANT – Samer El Itani, Senvion Canada (PAPER)

BPA EXPERIENCE WITH FIELD MEASUREMENTS FOR RENEWABLE PLANT MODEL VALIDATION – Steve Yang, BPA

MODEL VALIDATION WITH SIMP – A LOOK AHEAD – Richard Gagnon, IREQ

Session D: Presentation of Tools

HYPERSIM / OPAL PART 1 HYPERSIM / OPAL PART 2 – Jean Belanger, OPAL Technologies

EMTP-RV – Jean Mahseredjian, Ecole Polytechnique de Montreal

PSCAD – Ed Muljadi, NREL

SIMSCAPE POWERSYSTEMS – Patrice Brunelle, IREQ

EXPERIMENTAL DISTRIBUTION NETWORK: AN OVERVIEW – Yves Brissette, IREQ

TOOLS FOR DEVELOPMENT AND APPLICATION OF RENEWABLE GENERATORS MODELS IN PLANNING STUDIES – Pouya Zadehkhost, Powertech Labs

Session E: Difficulties and Challenges in Model Validation

Network Related Difficulties

INTERCONNECTION OF WIND PLANTS ON WEAK GRIDS – Andrew Isaacs, Electranix

DETERMINATION OF CRITICAL SYSTEM OPERATING CONDITIONS USING AGGREGATED WIND PLANT MODELS –  Michal Powalko, Energinet.dk

Measurement Related Challenges

MITIGATION OF MODEL VALIDATION CONCERNS USING REAL CODE MODELS – Dennis Woodford, Electranix

TURBINE VS PLANT LEVEL VALIDATION CHALLENGES – Kim Hoej Jensen, Pukar Mahat, Siemens

Software Related Challenges

CHALLENGES WITH PLATFORM MIGRATION – Ryan Quint, NERC

Session F: Future Studies and Tools – Needs for Model Validation with Increasing VG Penetration

BULK SYSTEM CO-SIMULATION STUDY TECHNIQUES – Andrew Issacs, Electranix

OVERCOMING DATA CHALLENGES FOR EMT MODELS – Sebastian Achilles, GE

FUTURE SIMULATION PROGRAM: REAL-TIME, OFF-LINE AND CO-SIMULATION – Jean-Claude Soumage, Gilbert Sybille, IREQ

FUTURE DEVELOPMENTS IN OFF-LINE SIMULATION WITH EMTP – Jean Mahseredjian, Ecole Polytechnique de Montreal

FUTURE DEVELOPMENTS IN OFF-LINE SIMULATION WITH SIMSCAPE POWERSYSTEMS/ MATHWORKS – Patrice Brunelle, IREQ

EXPERIMENTAL HIGH PERFORMANCE COMPUTING IN PSCAD – John Craig Muller, Manitoba Hydro HVDC Research Center

EXPERIMENTAL DISTRIBUTION NETWORK: INVENTING THE FUTURE – Mathieu Lambert, IREQ

  • Google Calendar
  • iCalendar
  • Outlook 365
  • Outlook Live

Details

Start:
May 9, 2016
End:
May 10, 2016
Event Category:
Meeting

Venue

The Saint Paul Hotel
350 Market Street
Saint Paul, MN 55102

Organizer

UVIG
  • DOE SunShot Solar Forecasting Projects »

Quicklinks

  • Member’s Area
  • Join ESIG

Contact

704-473-0135

PO Box 2787
Reston, Virginia
20195 USA

info@esig.energy

Follow Us!

Follow Us on FacebookFollow Us on TwitterFollow Us on LinkedInFollow Us on YouTube
This form needs Javascript to display, which your browser doesn't support. Sign up here instead

Special Thanks To Our Sustaining Members

© 2025 ESIG. All Rights Reserved
Custom Site by VIEO Design