Forecasting for Large Loads: Current Practices and Recommendations reviews utilities’ and system operators’ approaches to forecasting large loads—including from data centers, oil and gas, emerging industries, and manufacturing—and provides recommendations for improving forecast accuracy.
After two decades of relatively flat demand, utilities are now forecasting that the U.S. electricity system will grow at its fastest pace since the 1960s. Data centers are expected to account for roughly half of this growth and other emerging large loads accounting for most of the rest. However, the pace and scale of this change are uncertain, making it difficult for utilities and system operators to accurately forecast these loads to better inform resource and transmission planning.
Inaccuracies in load forecasts have important consequences—for consumers’ costs as well as for grid reliability. Load forecasts that under-estimate actual demand can lead to resource adequacy risks and a risk of under-serving customers due to insufficient infrastructure. Conversely, load forecasts that over-estimate demand could result in higher electricity prices to utility customers because infrastructure could be built but not ultimately needed. Utilities need accurate forecasts in order to efficiently plan and construct the necessary generation, transmission, and other facilities needed to serve new large loads together with other loads.
The report recommends that the industry adopt clear definitions for five core metrics that large load forecasts can use to characterize and evaluate new loads: (1) project realization (the rate at which projects included in the load forecast are placed in service), (2) energization date (the schedule for when a load will be placed into commercial operation), (3) load realization (the forecast peak load once new load projects fully ramp up to maximum operation), (4) load ramping (the monthly or annual forecast of demand from initial project energization to full forecast peak load), and (5) load factor (actual energy use as a proportion of peak demand) and load shape (more detailed energy use information such as an hourly schedule). Together, these describe whether, when, and how completely large load projects materialize and how they use electricity over time.
The report includes 10 recommendations to help more accurately measure—and reduce—load forecast uncertainty. The better a utility understands its load forecast, the more efficient and effective its transmission and generation resource planning can be. The recommendations also consider the needed steps and data to improve consistency across utilities, and address the potential for load flexibility for new large load customers.
The report was previewed in a pre-release webinar briefing on December 17, 2025, which was attended by nearly 300 industry experts and others with an interest in the topic. A recording and copy of the webinar presentation can be found at https://www.esig.energy/event/webinar-large-load-forecasting-practices/
Learn more about the work of ESIG’s Large Loads Task Force.